#QuestionOfTheWeek2026:

A service consists of three separate service-disconnect enclosures, and each enclosure is supplied by a different size set of ungrounded service-entrance conductors. According to 2026 NEC 250.28(D), how must the main bonding jumper in each enclosure be sized?

🔎 Study Challenge: Don't just look it up — find the information you need in the NEC first. Look for:

  • The specific rule for sizing main bonding jumpers when multiple service-disconnect enclosures have different conductor sizes.
  • The table used to determine the minimum size of the main bonding jumper based on the ungrounded conductors.

💬 Comment your answer and identify the NEC section(s) or table(s) you used.

⚡ 2026 NEC FastTraxTube.com

⚡ Study Credit: TRADEHOG.NET

⚠️ Educational question. Verify applicable requirements using the NEC edition and local amendments.

⚡ PREVIOUS QUESTION OF THE WEEK (2026)

⚡ QUESTION OF THE WEEK (2026)

Joshua Audette

(A) Is correct as When a service consists of separate disconnect enclosures supplied by different conductor sizes, each enclosure gets its own individual main bonding jumper sized to the ungrounded conductors supplying that specific enclosure 250.28(D)(2)